Zum Inhalt springen
KEAA International

Wir bauen Projekte. Wir liefern Exzellenz.

500+ abgeschlossene Projekte in 42+ Ländern.

Anwendungen

Wo KEAA-Ausrüstung eingesetzt wird

High-Rise Buildings

Access scaffolding

High-Rise Buildings

Facade access and edge protection at height, where a system scaffold has to repeat the same geometry floor after floor.

Commercial Construction

Formwork and access

Commercial Construction

Slab and wall casting on concrete frames, with props, fork heads and tripods carrying the soffit until the pour can carry itself.

Industrial Facilities

Maintenance and shutdowns

Industrial Facilities

Plant maintenance and shutdown work, where the structure is irregular and the bracing has to run where the job needs it.

Infrastructure Projects

Shoring and access

Infrastructure Projects

Bridges, tunnels and civil works, carried on load bearing shoring towers rather than on props alone.

Large-Scale Construction

System scaffolding

Large-Scale Construction

Long programmes where components are struck, stored and reused across phases, so interchangeability matters more than the first purchase price.

Livestock Housing

Agricultural buildings

Livestock Housing

Cattle, sheep, pig and horse housing, where galvanized steel has to survive slurry and ammonia without developing an edge an animal can catch.

Timber Structures

Garden and fencing

Timber Structures

Decking, pergolas, carports and fencing, where the connector and the ground anchor decide how long the timber lasts.

Export and Distribution

Supply

Export and Distribution

Dealers, builders merchants and rental fleets restocking a consistent range in container volumes.

Videos

Unser Fertigungsprozess & unsere Produktanwendungen im Video

Seite 1 von 2